Carlton Breast Center

With a hospital data center located on the floor below, close coordination of the work was crucial. From preconstruction to close-out Pellicano coordinated all aspects of the work with the staff to help minimize any possible disruption. Upgraded finishes were used through-out the space as the owner wanted to incorporate a “spa-like” feel. The project consisted of a large waiting room, reception, registration, dressing rooms, offices, consultation rooms, staff lounge, conference, and storage rooms. There are three (3) Mammography rooms, two (2) Ultrasounds, three (3) screen reading rooms, a Stereotactic and recovery rooms. Mechanically, a 44” diameter exhaust duct was extended from the 3rd floor to the roof and a new exhaust fan was installed to accommodate future build outs. Electrically, occupancy sensors were used in offices and storage rooms. The project was completed three (3) weeks ahead of schedule with substantial savings returned to the owner!