Meredyth Place Medical Office Building

Our *Healthcare Division managed the construction of this facility which consisted of shallow concrete  foundations, steel frame structure, masonry and EIFS facade, curtain wall and storefront with modified bitumen and metal roof systems.  The mechanical system included two, 200 ton air-cooled chillers, twelve air handling units and electrical reheat boxes. Fire protection included a wet pipe system with fire pump, a dry pipe system for soffits and canopies, and a pre-action system serving the MRI area.  The electrical systems included both normal and emergency power that is supplied from a 750 kw generator.  Interior build-outs included a Neuro-diagnostic Center, an Eye Center, an Eye Surgery Center with two operating rooms and associated pre-op and post-op areas, and a Diagnostic Center with MRI, CT, PET, X-Ray and Mammography equipment.  Later, a back up Data Center/Data Storage Room was added to support the main hospital.

*The construction of this structure was managed by our current Healthcare Division & SR VP/Director of Healthcare prior to joining Pellicano Construction.