Smith Drug Distribution Facility

The Smith Distribution Facility located in Valdosta, Georgia is comprised of 109,440 square feet. Pellicano contracted with the owner under a design/build cost, plus a fee with a GMP agreement. Because of the excellent partnering environment with everyone involved, the Pellicano Team was able to save the owner over $300,000 below the GMP and completed the project two months ahead of schedule.  The building is a steel frame structure with an insulated architectural precast concrete exterior panel and a clear interior height of thirty feet. Utilizing Air Rotation HVAC units the interior space was designed to maintain 72 degrees +/- 2 degrees. The facility also included 6,000 square feet of administrative office area with a mezzanine above.